Crews did so to allow for utility and construction work to continue in preparation for larger highway building activities in the west Little Rock area, including an $81 million project to widen Cantrell Road. Route 79/US 65B/AR 190.Until 2005, its southern terminus was in Bastrop, Louisiana, at an . 67 from Walnut Ridge to the Arkansas-Missouri state line to enhance connectivity and continuity of the National Highway System. The Project limits extend a total of 1.11 miles on Highway 10 from approximately Pleasant Ridge Road to Pleasant Valley Drive and includes: a. Job CA0901 Highway 264 New Hope Road 56 sold. The highway serves both the Fort Smith metropolitan area and the Little Rock - North Little Rock - Conway metropolitan area.. Aside from Little Rock in Pulaski County, the . East and West I-30 main lanes through the I-630 interchange narrowed from three to two lanes in both directions. A Design Layout for the project alternatives in this area can be viewed on the Departments website at the following address: Link to Design Layout for New Alternative: (click here). "This is when the permanent half-cent sales tax hike takes effect here in Arkansas.". The 6th Street Bridge will open on March 5 to limited traffic operations to accommodate the next phase of the 30 Crossing project. According to Wylie, 17 projects are completed; 12 are currently under construction; and 12 more are yet to be let to bid. The project's purpose is to develop an interstate highway system that addresses the above-described needs while minimizing the negative impacts to the natural and social environment. Through a voter-approved constitutional amendment, the people of Arkansas passed a 10-year, half-cent sales tax to improve highway and infrastructure projects. The Division is charged with the following responsibilities on all phases of the contract until the project is completed and the contractor is paid in full: The State Construction Engineer is assisted by Staff Construction Engineers. This project proposes to enhance one of the most traveled roads in Arkansas. The 30 Crossing project will widen a 6.7-mile corridor through downtown Little Rock and North Little Rock to 10 lanes between Interstate 530 in Little Rock and Interstate 40 in North Little Rock. The city is also planning a bike and pedestrian I-49 overpass at Watkins Avenue connecting Arkansas Children's Northwest with Randall Tyson Park. SUBJECT: Draft Highway 72 Improvement Study . 10 interchange will be reconstructed as a split-diamond interchange. The project resurfaced nearly three miles of the road. Schedules are preliminary and are subject to change as project development progresses. The addition of this alternative is in response to comments received at the public involvement meetings. of concrete; and 25,485 linear ft. of RC pipe culverts. The split diamond configuration will remove the cloverleaf ramps and provide direct ramp access with the frontage roads. The bridge is getting quite the makeover its original concrete gray color is covered with a natural brown color to aesthetically enhance the structure and help it blend in with its environment, Parker said. Arkansas voters approved Ballot Issue No. Collaborate. Traveling Idaho [tabby title="511 Road Report"] *NEW* 511 site to launch on . A few of the completed projects include: I-630 Pulaski County widening . Construction on the 30 Crossing project will require a long-term closure of McGowen Street in Little Rock in early October. The Curtis Sykes Drive entrance ramp to eastbound I-30 will be north and east to tie into I-40 east. info@ConnectingArkansasProgram.com, ArDOT Public Inform This should improve the connection between Highway 10 and Interstate 430, he said. McGeorge Contracting plans to complete the $75 million . The purpose of Project 012305 is to widen . CAP Information Line Questions pertaining to projects during the advertisement period should be addressed to [] Fort Washington, PA 19034 Job CA1002 Manila East, Job CA0705 County Road 27 Highway 79 The construction plan includes widening Highway 10 to six lanes, divided with a center median from Pleasant Ridge Road to Please Valley Drive, said Dave Parker, spokesperson for the Arkansas . Taxes are not raised on groceries, medicine or gas. 501.569.2227 The Resident Engineer is directly responsible for field construction projects on roads, bridges, and any other construction projects that are assigned to the Resident Engineer. Click to download an exhibit showing Phase 1 construction milestone dates, which are preliminary and subject to change. Ramp improvements at the I-630 interchange include: Work on 30 Crossing began in late summer, but Kimichik said the early winter months posed some weather-related challenges due to significantly colder temperatures and the high amount of rainfall Little Rock gets that time of year. 34.05150 \\ -118.27070 \\ Los Angeles \\ PA, I-630 Pulaski County widening (Manhattan Road & Bridge Co.): $96,523,759.01, Hwy. Thirty-one projects in 19 corridors across Arkansas are included in the CAP, which improves transportation connections to the four corners of Arkansas. Until the mid-1960s, this road was part of the original alignment of U.S. 71. This project continues the widening of Interstate 630 eastward from the Big Rock Interchange. The State Construction Engineer is also assisted by a Central Office Staff. What the committee came up with was a constitutional amendment to levy a temporary sales-and-use tax. If you do not have internet access, please contact the Environmental Division at 501-569-2281 to ask questions and get information about the proposed project. Job CA0905 County Road 34 Missouri State Line, Job CA1001 Monette Bypass Land-based equipment on the project is predominantly new Caterpillar gear purchased by the joint venture from the local Riggs CAT dealer. HSIP - Highway Safety Improvement Program Reports; Annual Wrong-Way Crash Studies; Strategic Highway Safety Plan; Crash Statistics; ACAT - Arkansas Crash Analytics Tool; Traffic Incident Management (TIM) Upcoming TIM Training Events; Electric Vehicle Infrastructure Deployment Plan; Districts. A public involvement meeting was held on March 25, 2014 in Maumelle to present and discuss the proposed plans for improvements to the I-40/I-430 interchange and widening . CAP Information Line The design also includes two turn-a-rounds under the Highway 10 overpass. Supporting the Arkansas Times' independent journalism is more vital than ever. The design also includes a feature known as a "Texas turnaround," which will allow drivers traveling south on I-430 to turn east on Cantrell. BIDS WILL BE POSTED FOLLOWING THE DOWNLOADING OF BIDS. The corridor will extend generally from Interstate 530 to Highway 67. Median work will also be completed. The Hwy. By the end of the decade, Arkansas will be the most well-connected state in the union if all projects complete as planned. info@ConnectingArkansasProgram.com, ArDOT Public Inform Highway department has amended plans for Arkansas 112 improvements in Northwest Arkansas, now seeking public input by Ron Wood | July 20, 2021 at 7:18 a.m. Fort Washington, PA 19034 Minute Order 2016-008 authorized a study to determine the need for and feasibility of improvements to Highway 72 between Interstate 49 in Bentonville The Staff Construction Engineers represent the Construction Office on field inspections and assist the District and Resident Engineers by recommending changes where construction difficulties have been encountered in the past. Now we extend those services and information to the internet. The Resident Engineers are the authorized representatives of the Chief Engineer within their assigned jurisdiction. The bridge will include an improved opening for the Arkansas River navigational channel. Making it as easy as possible to find the news and equipment that you need and want. The construction plan includes widening Highway 10 to six lanes, divided with a center median from Pleasant Ridge Road to Please Valley Drive, said. Job CA0202 Highway 425 Hamburg, Job CA0701 Highway 167 Improvements Widening Highway 10 from the existing 5 lane undivided section to a proposed 6 lane divided section with raised median. (#5570000) Site work and new construction of a hospitality development in Jonesboro, Arkansas. The SPUI consists of Highway 10 elevated over Rodney Parham with a bridge. [3] The highway leaves town and passes Fort Chaffee on its way to Logan County. Arkansas Highway 10 is an east-west state highway in West Arkansas. A collection of some of the most frequently asked questions concerning the Connecting Arkansas Program and the projects funded by the 10-year, half-cent sales tax. Project Number: 10-104. August 22-28, 2022 By Wesley Brown Arkansas highway officials said the downtown 30 Crossing project has reached a major milestone as construction workers are prepping to shift traffic onto the newly constructed I-30 Arkansas River bridge during the upcoming Labor Day holiday. Contributor articles do not necessarily reflect the policy or opinions of this publication. The Arkansas Department of Transportation (ARDOT) complies with all civil rights provisions of federal statutes and related authorities that prohibit discrimination in programs and activities receiving federal financial assistance. Highway 10 intersects Arkansas Highway 27 in Danville and AR7/AR 28 in Ola. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guides unrestricted right to edit and comment editorially. Jobs 090513 & 090514 & 012305. Motorists would travel west for a short distance, then make what amounts to a U-turn back to the east underneath the Cantrell Road ramp. Downtown Little Rock and North Little Rock will experience loud noise associated with the removal of the existing concrete roadway. "At this point in the project, we've held three stakeholder meetings since fall of 2020 and have visited several local businesses to communicate the project timeline.". The Arkansas State Highway Commission approved a bid for improvements by McGeorge Contracting Company, Inc. of Pine Bluff, Arkansas and awarded the contract at $38.4 million. 501.569.2227 c. Braided ramps north and south of Highway 10 connecting to I-430 Southbound. Third, an excavator will break piers to the waterline and haul off the debris. When complete, the improvements will enhance the transportation connection through central Arkansas, increase capacity, and improve traveler safety. Our monthly magazine is free at over 500 locations in Central Arkansas. Complaints of alleged discrimination and inquiries regarding the Departments nondiscrimination policies may be directed to Joanna P. McFadden EEO/DBE Officer (ADA/504/Title VI Coordinator), P. 0. Registration number 0957323. The ramps braid with the Highway 10 traffic crossing over the Rodney Parham traffic on a bridge. Pleasant Valley Farm Road runs for a short distance parallel to Cantrell Road on the south side of Little Rock and east from North Rodney Parham Road to Interstate 430 on the south side of Cantrell Road. State Rep. Justin Boyd, R-Fort Smith, and Highway Commissioner Keith Gibson worked to get the proposal before the . Do you have a question, comment, suggestion or concern? This creates a fourth lane without widening the freeway or bridge structures to add capacity. By becoming a subscriber or donating as little as $1 to our efforts, you'll not only have access to all of our articles, but you'll also be helping us hire more writers to expand our coverage and continue to bring important stories to light. That committee was charged with figuring out a way to finance transportation improvements and to propose highway finance legislation for the 2011 session. AR 10 proceeds east past the Arkansas State Capitol along the Arkansas River and underneath Broadway Street (US 70), becoming LaHarpe Boulevard in downtown. The contractor for the 30 Crossing project will begin bridge demolition operations on Monday, September 19. Demolishing and reconstructing the 6th Street bridge over Interstate 30 in Little Rock will require significant traffic pattern changes and closures along the Interstate 30 corridor next week. The I-430 Southbound exit ramp splits into two destinations, Highway 10 and Rodney Parham. It took until 2016 and more than $700 million to construct the 123-mile segment between Interstate 40 in North Little Rock and U.S. 412 in Walnut Ridge to interstate standards, said Alec Farmer of . Click the image below to open the build out for the 30 Crossing project, Phase 1. 1: a constitutional amendment that added a half-cent sales tax for 10 years with proceeds going to improve the state's intermodal transportation system, including projects to widen and improve about 200 mi. Contents Copyrighted 2023, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Thirty-one projects in 19 corridors across Arkansas are included in the CAP, which improves transportation connections to the four corners of Arkansas. Conway, Arkansas 72032 (501) 450-6105. These projects contribute to the six-lane widening of Interstate 49 between Fayetteville and Bentonville. CAP2 goes a little farther by including significant funds for additional lanes on Interstate 40 between North Little Rock and West Memphis, Ark. West Little Rock residents and commuters still have quite a while before things are polished. O-19-67. The proposed project will examine alternatives to improve Hwy. 10 (Cantrell Road) interchange (split diamond) and continues with four main lanes in both directions between 3rd Street and 9th Street. Attachments: Markham Street Neighborhood Specific Plan . Arkansas 10 also passes through a portion of the Ozark National Forest and parallel to the Petit Jean River, Petit Jean Wildlife Management Area and Lake Maumelle a chief source of water for residents in the Little Rock metropolitan area. "Kiewit Massman Construction has been closely coordinating with ARDOT and utility owners well in advance of breaking ground to work through all necessary ROW acquisitions and utility relocations to keep the project on schedule," Kimichik said. Job CA0904 Highway 71B Highway 72 South
Master Lock Combination Padlock Instructions, Articles A